Factory, Quality & Delivery
Machining, assembly, electrical integration and the no-load trial run all happen in our own building — every motion sequence, alarm and idle cycle is checked before the machine leaves our floor.
What we control in-house
20,000 ㎡ facility
Owned production building with dedicated machine assembly floors and a separate consumables workshop.
200+ sets of equipment
Machining centres, lathes, sheet-metal and finishing equipment for frames, metering parts and tooling.
200+ engineers & staff
R&D, mechanical design, PLC programming, assembly, quality and export service in one team.
No-load trial run
Every machine is cycled, sequence-checked and alarm-tested without adhesive before packing and shipment.
From incoming parts to a no-load trial run
Viscous-fluid filling equipment fails at the interfaces — a sealing ring, a mis-set piston stroke, a ratio drifting with temperature. Our inspection points target exactly those failure modes.
Incoming inspection
SS304 / SS316L material certificates, servo and PLC component verification, sealing part dimensional checks.
In-process assembly
Metering cylinder calibration, alignment of filling nozzles and cartridge holders, pneumatic circuit leak testing.
Ratio & dosing verification
Repeated fill-weight records across A/B channels, ratio drift alarm test, and piston seating depth checks.
No load trial run
PLC and servo power‑on self-test, idle cycle run of metering, filling and piston pressing units, motion sequence validation, alarm simulation, noise and abnormal vibration inspection with no adhesive loaded.
Export packing
Export-standard wooden case, moisture protection, fixing of moving parts, spare-parts kit and English documentation.
Quality & compliance
ISO 9001 certified, with production licences and CE conformity for applicable equipment. Documentation packages can be prepared for destination-specific requirements.
Commissioning & spare parts
- English manuals
- Remote commissioning support; on-site service by arrangement
- Recommended spare-parts kit shipped with every line
- Wear parts such as sealing rings held in stock
Shipping terms
Standard machines typically ship in 30–45 days; customised lines take longer depending on tooling. We work with EXW, FOB, CIF or DDP terms depending on destination.
Ask About Lead TimeAssembly floor & equipment
Questions engineers ask us first
Want to see a machine run with your material?
Send a sample and we will arrange a filling trial, then share the test results before you decide.