Factory, Quality & Delivery

Machining, assembly, electrical integration and the no-load trial run all happen in our own building — every motion sequence, alarm and idle cycle is checked before the machine leaves our floor.

Manufacturing strength

What we control in-house

20,000 ㎡ facility

Owned production building with dedicated machine assembly floors and a separate consumables workshop.

200+ sets of equipment

Machining centres, lathes, sheet-metal and finishing equipment for frames, metering parts and tooling.

200+ engineers & staff

R&D, mechanical design, PLC programming, assembly, quality and export service in one team.

No-load trial run

Every machine is cycled, sequence-checked and alarm-tested without adhesive before packing and shipment.

Quality control

From incoming parts to a no-load trial run

Viscous-fluid filling equipment fails at the interfaces — a sealing ring, a mis-set piston stroke, a ratio drifting with temperature. Our inspection points target exactly those failure modes.

01

Incoming inspection

SS304 / SS316L material certificates, servo and PLC component verification, sealing part dimensional checks.

02

In-process assembly

Metering cylinder calibration, alignment of filling nozzles and cartridge holders, pneumatic circuit leak testing.

03

Ratio & dosing verification

Repeated fill-weight records across A/B channels, ratio drift alarm test, and piston seating depth checks.

04

No load trial run

PLC and servo power‑on self-test, idle cycle run of metering, filling and piston pressing units, motion sequence validation, alarm simulation, noise and abnormal vibration inspection with no adhesive loaded.

05

Export packing

Export-standard wooden case, moisture protection, fixing of moving parts, spare-parts kit and English documentation.

Certification

Quality & compliance

ISO 9001 certified, with production licences and CE conformity for applicable equipment. Documentation packages can be prepared for destination-specific requirements.

After delivery

Commissioning & spare parts

  • English manuals
  • Remote commissioning support; on-site service by arrangement
  • Recommended spare-parts kit shipped with every line
  • Wear parts such as sealing rings held in stock

Shipping terms

Standard machines typically ship in 30–45 days; customised lines take longer depending on tooling. We work with EXW, FOB, CIF or DDP terms depending on destination.

Ask About Lead Time
Inside the factory

Assembly floor & equipment

Technical FAQ

Questions engineers ask us first

Want to see a machine run with your material?

Send a sample and we will arrange a filling trial, then share the test results before you decide.

Arrange a Sample Test